WESTMEAD​
Bayside Building Group
Commencing in January 2019 and partnering with the Bayside Building Group, Captain Formwork is delivering a formwork, steel fixing and concrete placement package for this project that includes:
- Strip footing and footing beams;
- Lift pit base, lift shaft wall and lifts over-runs;
- All slabs, as well as suspended slabs;
- Columns, service ducts etc.;
- Perimeter walls and internal walls; and
- Hobs, up-turns, down-turns, set-downs, kerbs, OSD tanks, tank pits etc.